• 1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant
  • 1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant
  • 1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant
  • 1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant
  • 1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant
  • 1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant

1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant

Size: Small
Type: Horizontal Hydro Generator
Bearing Support: Sliding Bearing
Speed: Low Speed
Bearing Number: 2
Standard: Standard
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
CJA475
Water Turbine Type
Pelton Turbine
Capacity
2X1500kw
Rated Water Head
206 M
Design Discharge
0.89m³/S
Rated Speed
600r/Min
Transport Package
Standard Export Packing, Wooden Cases, Structural
Trademark
FUCHUN
Origin
China

Product Description

Small Horizontal Pelton Turbine / impulse hydro turbine 1500kW

Rated Capacity

2×1500kW

Rated Head

206m

Unit Rated Flow

0.89 m³/s

Turbine Model CJA475-W-100/2*10
Type  Horizontal Pelton Turbine

No. of Nozzle

2

Jet Diameter

10cm

Runner Diameter  100cm
Runner Material Stainless Steel (06Cr13Ni4Mo)
Rated Rotation Speed 600r/min
Runaway Speed 997.4r/min

Generator Model

SFW1500-10/1430

Generator Type

Horizontal synchronous generator

Generator Rated Voltage

6.6kV

Frequency

50Hz

Power Factor

0.8 (lagging)

Excitation system

SCR

Insulation Class

F/F

Braking Way 

 Air  Braking 

Transformer

 6.6kV to 11kV

Auxiliary equipment main inlet valve, governor, transformer, LV&HV switchgear, SCADA, crane and so on


The turbine shall be adopted the structure of 85°/55° injection pipe. The lower part of manifold pipe inlet of turbine and the level shall be formed 15 °.

Turbine shall consist of Φ600 ball valve (Expansion pipe included), piping system, assembly of injection pipe, assembly of turbine housing, runner etc.

It shall be adopted the connection of flange for runner and shaft, settled by bolt, driven by flat key. There designs enough space on turbine housing so that it can be easily maintained and changed runner without removing main shaft of generator. Brake nozzle shall be mounted on turbine housing and be controlled by self-hold ball valve. When unit stops, it can be put into operation.

Governor can realize the control of start and stop of unit to guarantee on-cam relationship between the opening of deflector and stroke of needle.

Assembly of injection pipe includes: needle, nozzle tip ring, injection pipe, deflector, deflector shaft etc. Water shall pass through water passage, which is compassed of injection pipe, nozzle and needle etc. to inject from the middle of nozzle tip ring and needle to form a high speed water column. Through interaction of runner bucket and water column, water energy will become mechanical energy. This key part of turbine and runner become the heart of Pelton turbine. Deflector shall be used to cut off water flow quickly when load rejection occurs suddenly or during the adjustment of fluctuate. Servomotor can partly operate start and stop of needle automatically. Moving signals of needle will be transmitted to displacement of governor through feedback device and be transmitted to governor to realize automatic on-cam relationship of unit.

In order to assemble and maintain valve, there designs an extension pipe in ball valve outlet to compensate deviation of assembly and deformity of penstock.

Factory Test
1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant

Under Installation 
1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant


Staff

1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant

 

Company Information
Fuchun Industry Development Co., ltd Shenzhe is an experienced manufacture and engineering Company in small scale hydro power equipment ( 50Kw to 50Mw). We play the role of manufacture and EPC contractor and could supply water to wire equipments and services.

We provide customers with the complete package, from the design and manufacture of the turbine, generator and control equipment through to installation, commissioning and ongoing repair and maintenance.

1.Water Turbine Generator Unit Design & SUPPLY
2.Hydropower equipment supply 
3.Feasibility study of hydropower project
4.Manufacture
5.Installation & Supervision
6.Commissioning and Training service
7. Hydro power plant rehabilitant

8. Hydro power plant spares supply
9.Services

Prominent Design 
Professional Service

Prime Products  
Prestigious Manufacturer 
1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant

Our factory occupies 560,000 square meters of land,which inculdes 18 workshops,over 320 sets of heavy and precision producing and testing machinery;scientific research development center in the southern China,and various testing facilities.Besides of our 50 years industrial experice and expertise, we also hold close ties with several research institutions and universities in this field in order to maintain advanced technology and to develop new products.More than 20 kinds of our products have been granted national or provincial technical progress and excellent products awards.We fully carry out the ISO9001 quality management system.Our products can meet IEC standard and CE requirements.

Fabricating Machinery
Horizontal Lathe, MC1363 cylindrical grinding machine, B1016A facing machine,Two points closed pressural machine, CQ5250 CNC Double Column Vertical Lathe, CNC Flame Cutting machine, 500T Press machine 500T, VacuumPressure Impregnating, the production line of resin-bonded sand and so on.
1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant

Packaging & Shipping
 standard export packing, wooden cases, structural steel, seaworthy packing
1500kw Pelton Turbine / Impulse Hydro Turbine with Two Nozzles for Hydro Power Plant

 

Our Services

Usually we guide the installation. We will dispatch engineers to site.(electrical engineer, mechanical engineer, control engineer and a translator according to requirement)

1.Water head:___M
2.Water flow:____M3/s
3.Frequency: 50HZ/60HZ
4.Generator outgoing line voltage:__Kv
5.On-grid or Off-grid type? (On-grid type voltage:____Kv)

Send your message to this supplier

*From:
*To:
avatar Mr. Wu Jianhua
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now