• Water Turbine Spare Parts / Hydro Power Plant Rehabilitant

Water Turbine Spare Parts / Hydro Power Plant Rehabilitant

Output Type: AC Three Phase
Size: Small
Type: Horizontal Hydro Generator
Speed: Medium Speed
Bearing Number: 2
Standard: Standard
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
HL/CJ/ZZ/GD
Transport Package
Wooden Case or Plywood Case or Steel Frame
Specification
50kW-50MW
Trademark
FUCHUN
Origin
China

Product Description

Water Turbine Replacement / Hydro Turbine Maintenance

Water Turbine Spare Parts / Hydro Power Plant Rehabilitant


Reference HPPS
1, Georgia 12Mw HPP (3 units of 4000Kw Pelton turbine units), we have manufactured two stainless steel runners equipped with shafts in 2009. After change new runner and shafts the turbine units improve 10% of the output. In 2010, changed the third unit.

Services:

1 Improve the hydraulic structure such as water storage, sediment flushing equipment, to minimize the sediment percentage. At the same time, use specially coated anti-brassing runner.

2, Improve the headrace channel, gates, and branch pipe to minimize the head loss, guarantee the output during raining season.

3, Measure and check the basic parameter of hydro power plant, and optimize the hydro resource usage.

4, Optimize the turbine and generator types by changing turbine, runner or increase one more turbine.

5, Optimize the auxiliary of the existing generator, Improve excitation system and control system, checking and change main transformer

6, Improve the supports and lubricant transmission mechanical structure, to minimize the loss and improve turbine unit efficiency.

7, To install a suitable turbine unit specially for the dry season. Asynchronous generator is prefer for a non- man operation power station.

8, To explore nearby micro hydro resource to parallel grid operation increase the total output

Fuchun Industry is experienced in hydro power which has been producing turbine generator units since 1950's and has congregated a large group of engineers in hydro power field and knows well how to make the hydro power plant produce more power, increase efficiency 10-20%.

Send your message to this supplier

*From:
*To:
avatar Mr. Wu Jianhua
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now